Billet Department

Billet physical integrity and dimensions are controlled by a specially designed cooling chamber water spray and guide system to ensure the necessary secondary processing requirements are adequately addressed. Every billet is mechanically stamped with the appropriate heat identity number to ensure against cross-contamination during secondary forming operations.